Skip to content

The SLM is unreliable, so favor Faraday cup for the livetime.

Baltzell, Nathan requested to merge iss46-scalers into development

Created by: baltzell

This is a stopgap before correctly using the clock (for run periods where it doesn't rollover). The downside is that the offset of the Faraday cup is much larger than the SLM in previous years, so there's a systematic error hit there, but that's irrelevant when the SLM is misbehaving. Ultimately, using the clock, which currently requires going back to EVIO, will bring everything to sanity.

Merge request reports

Loading